SURVEY DETAILS FOR PRPOSED LINE


FEEDER DETAILS
S NO POLE TYPE CONDUCTOR DISTANCE (KM) SCHEDULE REFERENCE TOTAL COST(RS)PER KM TOTAL COST(RS)
1 H_BEEM_13_METER RABBIT 5.40 M1.4 10000 54000.00

54000

S NO SUPPORT TYPE POLE TYPE QUANTITY SCHEDULE REFERENCE TOTAL COST(RS)EACH TOTAL COST(RS)
1 DP H_BEAM_13_METER 11 C-6.1 117840 1296240

1296240

GRAND TOTAL=1350240

S NO SUPPORT TYPE QUANTITY
1 POLE 78
2 SINGLE_POLE_CUT_POINT 0
3 DP 11
4 TP 0
5 4P 2
S NO POLE TYPE QUANTITY
6 H_BEAM_13_METER 91:RABBIT
7 H_BEAM_11_METER 0:RABBIT
8 CONCRETE_POLE_9_METER 0:RABBIT
9 CONCRETE_POLE_11_METER 0:RABBIT
S No POLE ID POLE TYPE SUPPORT TYPE CONDUCTOR TYPE TAP POINT
1 1 H_BEAM_13_METER 4P RABBIT ---
2 2 H_BEAM_13_METER 4P RABBIT ---
3 3 H_BEAM_13_METER POLE RABBIT ---
4 4 H_BEAM_13_METER POLE RABBIT ---
5 5 H_BEAM_13_METER POLE RABBIT ---
6 6 H_BEAM_13_METER POLE RABBIT ---
7 7 H_BEAM_13_METER POLE RABBIT ---
8 8 H_BEAM_13_METER POLE RABBIT ---
9 9 H_BEAM_13_METER DP RABBIT ---
10 10 H_BEAM_13_METER DP RABBIT ---
11 11 H_BEAM_13_METER POLE RABBIT ---
12 12 H_BEAM_13_METER POLE RABBIT ---
13 13 H_BEAM_13_METER POLE RABBIT ---
14 14 H_BEAM_13_METER POLE RABBIT ---
15 15 H_BEAM_13_METER POLE RABBIT ---
16 16 H_BEAM_13_METER POLE RABBIT ---
17 17 H_BEAM_13_METER POLE RABBIT ---
18 18 H_BEAM_13_METER POLE RABBIT ---
19 19 H_BEAM_13_METER DP RABBIT ---
20 20 H_BEAM_13_METER POLE RABBIT ---
21 21 H_BEAM_13_METER POLE RABBIT ---
22 22 H_BEAM_13_METER POLE RABBIT ---
23 23 H_BEAM_13_METER POLE RABBIT ---
24 24 H_BEAM_13_METER POLE RABBIT ---
25 25 H_BEAM_13_METER POLE RABBIT ---
26 26 H_BEAM_13_METER POLE RABBIT ---
27 27 H_BEAM_13_METER POLE RABBIT ---
28 28 H_BEAM_13_METER POLE RABBIT ---
29 29 H_BEAM_13_METER POLE RABBIT ---
30 30 H_BEAM_13_METER POLE RABBIT ---
31 31 H_BEAM_13_METER POLE RABBIT ---
32 32 H_BEAM_13_METER POLE RABBIT ---
33 33 H_BEAM_13_METER POLE RABBIT ---
34 34 H_BEAM_13_METER POLE RABBIT ---
35 35 H_BEAM_13_METER POLE RABBIT ---
36 36 H_BEAM_13_METER DP RABBIT ---
37 37 H_BEAM_13_METER POLE RABBIT ---
38 38 H_BEAM_13_METER POLE RABBIT ---
39 39 H_BEAM_13_METER POLE RABBIT ---
40 40 H_BEAM_13_METER POLE RABBIT ---
41 41 H_BEAM_13_METER POLE RABBIT ---
42 42 H_BEAM_13_METER POLE RABBIT ---
43 43 H_BEAM_13_METER POLE RABBIT ---
44 44 H_BEAM_13_METER POLE RABBIT ---
45 45 H_BEAM_13_METER POLE RABBIT ---
46 46 H_BEAM_13_METER POLE RABBIT ---
47 47 H_BEAM_13_METER POLE RABBIT ---
48 48 H_BEAM_13_METER DP RABBIT ---
49 49 H_BEAM_13_METER POLE RABBIT ---
50 50 H_BEAM_13_METER POLE RABBIT ---
51 51 H_BEAM_13_METER POLE RABBIT ---
52 52 H_BEAM_13_METER POLE RABBIT ---
53 53 H_BEAM_13_METER POLE RABBIT ---
54 54 H_BEAM_13_METER POLE RABBIT ---
55 55 H_BEAM_13_METER POLE RABBIT ---
56 56 H_BEAM_13_METER POLE RABBIT ---
57 57 H_BEAM_13_METER POLE RABBIT ---
58 58 H_BEAM_13_METER POLE RABBIT ---
59 59 H_BEAM_13_METER POLE RABBIT ---
60 60 H_BEAM_13_METER DP RABBIT ---
61 61 H_BEAM_13_METER POLE RABBIT ---
62 62 H_BEAM_13_METER POLE RABBIT ---
63 63 H_BEAM_13_METER POLE RABBIT ---
64 64 H_BEAM_13_METER POLE RABBIT ---
65 65 H_BEAM_13_METER POLE RABBIT ---
66 66 H_BEAM_13_METER POLE RABBIT ---
67 67 H_BEAM_13_METER POLE RABBIT ---
68 68 H_BEAM_13_METER POLE RABBIT ---
69 69 H_BEAM_13_METER POLE RABBIT ---
70 70 H_BEAM_13_METER POLE RABBIT ---
71 71 H_BEAM_13_METER POLE RABBIT ---
72 72 H_BEAM_13_METER POLE RABBIT ---
73 73 H_BEAM_13_METER POLE RABBIT ---
74 74 H_BEAM_13_METER DP RABBIT ---
75 75 H_BEAM_13_METER DP RABBIT ---
76 76 H_BEAM_13_METER DP RABBIT ---
77 77 H_BEAM_13_METER POLE RABBIT ---
78 78 H_BEAM_13_METER POLE RABBIT ---
79 79 H_BEAM_13_METER POLE RABBIT ---
80 80 H_BEAM_13_METER POLE RABBIT ---
81 81 H_BEAM_13_METER POLE RABBIT ---
82 82 H_BEAM_13_METER POLE RABBIT ---
83 83 H_BEAM_13_METER POLE RABBIT ---
84 84 H_BEAM_13_METER POLE RABBIT ---
85 85 H_BEAM_13_METER POLE RABBIT ---
86 86 H_BEAM_13_METER POLE RABBIT ---
87 87 H_BEAM_13_METER POLE RABBIT ---
88 88 H_BEAM_13_METER DP RABBIT ---
89 89 H_BEAM_13_METER DP RABBIT ---
90 90 H_BEAM_13_METER POLE RABBIT ---
91 91 H_BEAM_13_METER POLE RABBIT ---